This is the start of the roof being opened up for the dormers -
And this is the inside starting to take shape:
And starting to take shape from the outside too. Unfortunately this is when the rest of the house started to get wet as they were incapable of sealing the hole - it was pretty horrific weather though but they still sould have been able to seal it.
This is the extension (garage) starting to take shape:
This is the rear dormer structure complete but covered to keep the rain out (badly but better than the front!)
This is the rear of the extension - looking in from the kitchen window
This is where the loft hatch used to be - now just a hole for the ladders between the new joists:
this is the roof trusses (which they built themselves to keep costs down) for the extension extension:
Preparations for the opening up for the stairs:
If you look just to the right of the tank you'll see where the velux window is going above the stairs.
hole for stairs:
And the remains of the old kitchen after it was demolished -
they dont make kitchens like that any more - took them ages to smash it up :D
I'll split it into 2 posts - dont want to spoil you too much!!!
No comments: